Development, preparation, roof control, exploitation and various services since 2013.
Development, preparation and exploitation works:
- Negative and positive ramps
- Drift, bypass, chambers and sublevels
- Exploitation using Bench and Fill
Roof Control:
- Shotcrete e = 2 “8000 m2 / month
- Helical Bolts (3000 units)
Ore and waste transport:
- Ore: 60000 ton
- Waste: 50000 ton