Development, preparation, roof control, and various services since 2021.
Development, preparation and exploitation works:
- Negative and positive ramps
- Drift, bypass, chambers and sublevels
Roof Control:
- Shotcrete 1600 m3/mes
- Hydrabolt Bolts (4000 units)
- Electrowelded mesh (4000 m2)
Waste transport:
- Waste: 22000 ton