- Location: Chuquiquirpay, Cerro de Pasco – Perú
- Period: 2013– 2021
- Status: Finished
Services:
- Horizontal workings and ramp excavations.
- Mining using the SLS method.
- Support with rock bolts and mesh
- Shotcrete support (mix prep, transport, spraying)
- Mineral loading and haulage with dump trucks
- Auxiliary services (intensive pumping, peak flows up to 800 l/s)